Skip to content

Use valuations to produce cashflow report for project lifespan #191

Description

@rochecompaan

Refer to the Summary (1) sheet of the DCD Building Repairs spreadsheet on Dropbox. We want to produce a report similar to this, where each column will be represented by a valuation for the project.
One could use the existing valuation report as starting point and then extend it to show columns for all valuations for a given project. The only difference should be that the value shown for each valuation item must show only what is due on that valuation eg. if 10% was claimed for Waterproofing on valuation 1 and 30% on valuation 2, then valuation 2 must show the calculate the value for 20% (30% - 10% on first claim).

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions