Skip to content

Repository files navigation

Critical Paths in .NET: Extension Method

This is a rewrite of Critical Path Method Implementation in C#. It has the following features over and above the original:

  • It uses generics to avoid type dependency. Extra metadata is stored internally
  • The public method is an extension method on IEnumerable, so any list works
  • Task information can come in any order. Pass in a lambda to tell the engine how to get a task's predecessors and another lambda to get the task length and it will figure out the rest
  • If a loop is detected in the path, an exception will be thrown

It is used in a production web site and is stable at this point

About

No description, website, or topics provided.

Resources

Stars

15 stars

Watchers

1 watching

Forks

Releases

Packages

Used by

Contributors

Languages