17 changes: 16 additions & 1 deletion docs/overhaul-execution-runbook.md
Original file line number Diff line number Diff line change
Expand Up @@ -429,6 +429,14 @@ After the launch packet is complete:
releases `dbd9d7ca947e28b041fbb1b72667f0283265189f`; no source is
currently due.

Automatic publication is temporarily paused at both the repository and
`release-production` environment latches. The controller correctly failed
closed after the append-only historical State work changed its reviewed State
schema tree. Keep both latches false until a minimal descendant-compatible
State contract is merged, its publication-disabled no-op passes against
protected State, and both effective latch values are read back after the
ordered restore. No release is due during this repair window.

### 10.2 Lifecycle APIs

- [x] Enable only backfill, repair/retraction, maintainer decisions,
Expand Down Expand Up @@ -501,6 +509,13 @@ postponed if any is not satisfied. The canary's first automatic-release
checkpoint is `2026-11-02T03:50:01.002Z`. Full overhaul completion remains
blocked until these calendar gates and the operational checks below pass.

The repository variable `ISSUE_INTAKE_CUTOFF` is already installed and read
back as the exact announced timestamp `2026-09-30T06:57:10Z`. It has no effect
until the reviewed cutoff guard reaches protected `main`; merge that guard only
after the retained replay chains are terminal, then verify its protected-main
CI before the timestamp. Deleting the variable is the reversible incident
recovery that reopens issue intake before the form itself is retired.

- [ ] Monitor severity-high incidents and readiness failures.
- [ ] Monitor State validation, archive completion, evaluation dispatch,
release scheduling, and automatic releases.
Expand Down Expand Up @@ -791,7 +806,7 @@ Update this table in place; do not append a history beneath it.
| 3. Final staging acceptance | Complete | — |
| Production launch readiness | Complete | — |
| 4. Launch | Complete; live | — |
| 5. Four-week overlap | In progress; calendar-bound | Keep issue intake open through at least `2026-09-30T06:57:10Z`; the exact conditional closure notice matures `2026-09-16T23:06:35Z`, and the canary automatic-release checkpoint is `2026-11-02T03:50:01.002Z` |
| 5. Four-week overlap | In progress; automatic publication safely paused; calendar-bound; future cutoff variable installed | Repair and verify the release controller's descendant-compatible State contract before restoring both publication latches; keep issue intake open through at least `2026-09-30T06:57:10Z`; merge and verify the reviewed cutoff guard after the retained drain; the conditional closure notice matures `2026-09-16T23:06:35Z`, and the canary automatic-release checkpoint is `2026-11-02T03:50:01.002Z` |
| 6. Historical completion | Retained drain active; not ready; final delta calendar-bound | Automatically replenished public and private chains began with runs `33721331694` and `33721331419` through bounded-wave driver `33721323539`. Process the separately bound delta only after issue-intake cutoff; safe stop deletes both controller variables first. |
| 7. Remaining product completion | In progress | Open problems and editorial work are complete; final live release/replay presentation and issue closure retain their calendar, stability, adoption, final-delta, and readiness gates |
| Final audit | Preparatory cleanup complete; final audit pending | Repeat the audit after all phases and confirm only explained launch and retirement work remains |