34 changes: 19 additions & 15 deletions docs/overhaul-execution-runbook.md
Original file line number Diff line number Diff line change
Expand Up @@ -160,9 +160,10 @@ Staging and production serve healthy submissions Worker
`e28473c5c83764a044cb9d2666e1b815517e6d0e`. Protected submissions main
matches that runtime. Staging intake and public lifecycle routes are disabled;
its promotion canary remains enabled.
Production intake is durably enabled, as are the approved owner, maintainer,
and one-way publication-opt-in routes. Model consolidation and publication
opt-out remain disabled in both environments. General replay is disabled. The
Production intake is configured and effectively disabled while the source-App
admission boundary is repaired. The emergency pause also keeps every public
lifecycle route disabled. Model consolidation and both publication-choice
mutation directions remain disabled in both environments. General replay is disabled. The
production steady state contains neither historical replay-controller variable.
The active bounded retained-corpus drain in Phase 6 temporarily installs both
`HISTORICAL_PUBLIC_REPLAY_CONTROLLER_ENABLED` and
Expand All @@ -179,12 +180,12 @@ The server-primary entry is live. The overlap began

- [x] Read staging and production intake health.
- [x] Read staging and production broker/replay health and current versions.
- [x] Verify production intake is durably enabled and staging intake is
disabled.
- [x] Verify production and staging intake are configured and effectively
disabled during the source-App admission repair.
- [x] Verify general replay is disabled and both historical replay-controller
variables are absent from production outside an active bounded run.
- [x] Verify automatic publication and the approved lifecycle routes are live,
while publication opt-out and model consolidation remain disabled.
- [x] Verify automatic publication remains live while every public lifecycle
route is disabled during the source-App admission repair.
- [x] Verify the exact deployed Worker is healthy and its release, archive, and
retained-State checkpoints form one coherent unit.

Expand Down Expand Up @@ -409,9 +410,10 @@ The compact launch packet is protected in submissions migration head
is `e28473c5c83764a044cb9d2666e1b815517e6d0e`. All Phase 4 launch fields are
complete.

Production launch is complete. Historical completion, overlap elapsed time,
issue-closure notice, and the canary's later release date remain required for
full overhaul completion.
Production launch completed and server intake is temporarily paused at the
documented safety boundary. Historical completion, overlap elapsed time,
issue-closure notice, the source-App admission repair, and the canary's later
release date remain required for full overhaul completion.

The launch lifecycle and durable-intake configuration is deployed at
`e28473c5c83764a044cb9d2666e1b815517e6d0e`. The server-primary entry and
Expand Down Expand Up @@ -792,8 +794,10 @@ disabled, and no migration or replay run or temporary executor remains.
- [ ] Mark this runbook complete and summarize current operation and ordinary
maintenance ownership.

Production launch is complete. Full completion is deliberately calendar-bound
and occurs only when every completion-plan criterion is actually satisfied.
Production launch completed; server intake is temporarily paused while the
source-App admission boundary is repaired. Full completion is deliberately
calendar-bound and occurs only when every completion-plan criterion is actually
satisfied.

## 15. Compact status table

Expand All @@ -807,8 +811,8 @@ Update this table in place; do not append a history beneath it.
| Credential boundary | Complete | — |
| 3. Final staging acceptance | Complete | — |
| Production launch readiness | Complete | — |
| 4. Launch | Complete; live | — |
| 5. Four-week overlap | In progress; automatic publication live; calendar-bound; future cutoff variable installed | Keep issue intake open through at least `2026-09-30T06:57:10Z`; merge and verify the reviewed cutoff guard after the retained drain and before that timestamp; the conditional closure notice matures `2026-09-16T23:06:35Z`, and the canary automatic-release checkpoint is `2026-11-02T03:50:01.002Z` |
| 6. Historical completion | Retained drain active; final-delta closure drafts open; not ready; calendar-bound | Continue the bounded public/private drain with the packet's safe-stop and retry rules. After it finishes, merge the audit companion and rebind the submissions final-delta implementation before the cutoff; process the separately bound delta only after issue-intake cutoff. |
| 4. Launch | Complete; server intake temporarily paused | Repair and verify the source-App admission boundary before restoring server intake |
| 5. Four-week overlap | In progress; automatic publication live; server intake and public lifecycle routes paused; calendar-bound; future cutoff variable installed | Resolve the source-App admission incident and restore the supported server path and approved lifecycle routes; keep issue intake open through at least `2026-09-30T06:57:10Z`; merge and verify the reviewed cutoff guard after the retained drain and before that timestamp; the conditional closure notice matures `2026-09-16T23:06:35Z`, and the canary automatic-release checkpoint is `2026-11-02T03:50:01.002Z` |
| 6. Historical completion | Public retained drain active; private drain paused for an executor-readiness repair; final-delta closure drafts open; not ready; calendar-bound | Continue the bounded public drain and restore the private drain only after the reviewed readiness fix. After both finish, merge the audit companion and rebind the submissions final-delta implementation before the cutoff; process the separately bound delta only after issue-intake cutoff. |
| 7. Remaining product completion | In progress | Open problems and editorial work are complete; final live release/replay presentation and issue closure retain their calendar, stability, adoption, final-delta, and readiness gates |
| Final audit | Preparatory cleanup complete; final audit pending | Repeat the audit after all phases and confirm only explained launch and retirement work remains |