Skip to content

Update dependency googletest to v1.18.0.bcr.1 - #4601

Open
renovate[bot] wants to merge 1 commit into
mainfrom
renovate/googletest-1.x
Open

renovate[bot] wants to merge 1 commit into
mainfrom
renovate/googletest-1.x

Conversation

@renovate

@renovate renovate Bot commented Sep 18, 2026

Copy link
Copy Markdown
Contributor

This PR contains the following updates:

Package Type Update Change
googletest bazel_dep minor 1.17.0.bcr.21.18.0.bcr.1

Configuration

📅 Schedule: (UTC)

  • Branch creation
    • "before 8am on Monday"
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR was generated by Mend Renovate. View the repository job log.

@renovate
renovate Bot requested a review from a team as a code owner September 18, 2026 21:55
@codecov

codecov Bot commented Sep 18, 2026

Copy link
Copy Markdown

Codecov Report

✅ All modified and coverable lines are covered by tests.
✅ Project coverage is 86.51%. Comparing base (fc89acb) to head (aebc09f).
⚠️ Report is 1 commits behind head on main.

Additional details and impacted files

Impacted file tree graph

@@            Coverage Diff             @@
##             main    #4601      +/-   ##
==========================================
- Coverage   86.51%   86.51%   -0.00%     
==========================================
  Files         525      525              
  Lines       20464    20464              
==========================================
- Hits        17703    17702       -1     
- Misses       2761     2762       +1     

see 1 file with indirect coverage changes

🚀 New features to boost your workflow:
  • ❄️ Test Analytics: Detect flaky tests, report on failures, and find test suite problems.

@marcalff

Copy link
Copy Markdown
Member

Fails in bazel 8.5.0:

ERROR: Error computing the main repository mapping: googletest@1.18.0.bcr.1 depends on abseil-cpp@20260526.0 with compatibility level 0, but depends on abseil-cpp@20260107.1 with compatibility level 1 which is different

@renovate
renovate Bot force-pushed the renovate/googletest-1.x branch from 89770cd to 6aff587 Compare September 19, 2026 23:19
@marcalff

Copy link
Copy Markdown
Member

Blocked by:

@marcalff marcalff added the issue:blocked Fix blocked, waiting for other fixes as prerequisites label Sep 20, 2026
@renovate
renovate Bot force-pushed the renovate/googletest-1.x branch 3 times, most recently from ae79c09 to cd82178 Compare September 20, 2026 13:08
@marcalff

Copy link
Copy Markdown
Member

@renovate
renovate Bot force-pushed the renovate/googletest-1.x branch 3 times, most recently from 61565f1 to ed569bb Compare September 20, 2026 16:20
@renovate
renovate Bot force-pushed the renovate/googletest-1.x branch from ed569bb to aebc09f Compare September 20, 2026 19:07
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

issue:blocked Fix blocked, waiting for other fixes as prerequisites

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant